Moving a factory is quite different from moving an office. It takes more time and more planning because a factory move is not like stacking desks and furniture in a van and unloading them at the new place. Moving machinery is challenging because a single production line can weigh tons. There is precise calibration involved, and each extra minute the machine sits idle, it costs businesses real money. Another thing about moving machinery is that it should not get damaged during the move. If a machinery gets damaged during the move, it could put a business behind schedule for weeks, not days. Hiring experts in factory relocation in Dubai helps with that it takes a huge load off your shoulders.
It is practically not possible to have a successful factory relocation without planning. Spending time on a plan actually saves time because that’s where the professionals spend most of their time.
The relocation plan begins with a site survey to take note of floor load capacity, door clearances, and other challenges involved. During the survey, the exports will make a note of which equipment moves first, based on what actually keeps production running at the new site.
There is no doubt that industrial equipment has to be handled with care. These equipment are calibrated to fractions of a millimetre. Rough handling can cause that to change. The precision will be lost. This is why it is important to do proper planning. Knowledgeable technicians dismantle the machinery and put it back again using moisture resistant and shock absorbent packing materials. Using these materials would protect the sensitive parts of the machinery. The movers use the right cranes, jacks, and rigging gear to do dismantling and assembling.
Improper planning can cause the machinery to sit idle for hours. Expert factory relocation services in Dubai will prevent that kind of downtime from happening. This is where strategic coordination is important because the entire move will be sequenced properly so nothing sits waiting on something else that hasn’t happened yet.
The machine moving will be planned according to which machines need to run. The moving company will plan the transport, cranes, and the reassembly crew so the move will happen clockwise. Many factories also plan the move around a weekend or during a scheduled shutdown, so it will not affect the production run.
During a factory relocation, it is very important to consider the real risk, heavy loads, tight clearances and utilities that need to be disconnected before anything gets moved. Experts will do a proper risk assessment so the move will happen perfectly.
The moving company will first check floor loads before planning the moving route. To ensure safety, the team will first disconnect and label cables and pipes so there will be no confusion at the end. Established safety standards will be followed diligently for each move.
A factory move involves more than machines. You have to ensure that the cranes, trailers, forklifts, a rigging crew and the workforce are there at each place at the right times to ensure proper coordination. That means there should be not a single minute of wastage. There should be right lifting equipment so the machinery doesn’t have to sit idle anywhere. It also means there should be a workforce on both ends!
It is important to avoid these mistakes while relocating factory machinery:
The most obvious parameter while choosing a factory relocation partner is that the partner should have experience with moving industrial equipment specifically. Ask whether the team consists of certified riggers and engineers, not just labour and a truck. Find out what all equipment they bring in for the move – cranes, forklifts and low-bed trailers, rigging gear are mandatory.
It would also help to know if the moving partner has proper insurance coverage and HSE compliance. Flexibility is also an important concern especially when you want the move to happen around weekends.
Al Dana Group is an expert in factory relocation in Dubai, including the Jebel Ali Industrial Area. Our team consists of certified riggers and engineers managing every lift. Every move is planned carefully with proper site assessment and detailed plan. We will plan the cable disconnection, the move itself and perform machine reassembly at the new location with precision leveling tools. We have all the equipment for the perfect move – boom trucks, pick and carry cranes, forklifts, low bed trailers and rigging gear.
The success of a factory relocation is based on the experience of the moving company, their equipment and their crew. Planning protects the machinery, keeps downtime to a minimum and keeps everyone on site safe during the move.